top of page
Substation
![MPD Contruction 6.JPG](https://static.wixstatic.com/media/9c29c1_19f013ddcceb4b1daccab12a62981b88~mv2.jpg/v1/fill/w_980,h_551,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/9c29c1_19f013ddcceb4b1daccab12a62981b88~mv2.jpg)
Value £2,420,000
Groundworks | Formworks | Grid Route
MPD teams delivered the bespoke FRC transition between the newly erected data centre and the high voltage transmission units.
Quality, safety and certainty are attributes that MPD is renowned for. All are evidenced in the skilful implementation of our in-house temporary works designs, and in the work of MPD’s concrete team, who poured with caution and finished to perfection.
![MPD Blu3 Slough RedKite](https://static.wixstatic.com/media/9c29c1_2c4a04f9d6784c73a5633836d62138d2~mv2.jpg/v1/crop/x_0,y_318,w_900,h_989/fill/w_900,h_989,al_c,q_85,enc_avif,quality_auto/Blu3%20-%20Slough%20RedKite%20DC6.jpg)
![MPD Blu3 Slough RedKite](https://static.wixstatic.com/media/9c29c1_d96b870ee2ec40d88493e73898fdb3a3~mv2.jpg/v1/fill/w_981,h_736,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Blu3%20-%20Slough%20RedKite%20DC5.jpg)
bottom of page